Lianyungang Zhongfu Lianzhong Composites Group Co., Ltd
+86-518-80307662
1.5mm Dust Stopped Fence Wind Air Screen Perforated Metal

1.5mm Dust Stopped Fence Wind Air Screen Perforated Metal

1. Upgrading from activated sludge process to MBBR biology thermopnore takes only 4-30 days.
2. The volume loading of MBBR tank is 1.7-5 times that of activated sludge process.
3. It has an absolute cost advantage for water quality of low pollution concentration and high flow.

  • Description

    We emphasize development and introduce new products into the market every year for 8040 High Flux RO Membrane ELements, sewage treatment continuous winding FRP pipe, 8 Inch Nanofiltration Membrane Element. We take reform and innovation as the endogenous driving force to drive the company's development and strengthen the support of innovation strategy. Sincerely look forward to your support and cooperation! We insist on realizing customer value as the core and considerate service as the soul.

    Product Features

    Reduce TOC effectively, Desilication, Extra high rejection.


    Applications

    Filter heavy metals, high concentration salts and degradation-resistant COD. Desilication and TOC Reduction of high salt concentration.


    Technical Parameters

    Model

    Permeate Flow GPD (m3/d)

    Active Membrane Area ft2 (m2)

    Stabilized Salt Rejection

    Feed Spacer mil (mm)

    Test Conditions

    MW-XR4040

    2050(7.7)

    85(7.9)

    99.75%

    28(0.7)

    225psi/2000ppmNaCl

    1. All performance data are collected at 25℃ (77℉), PH7.4 - 7.6 and 15% recovery rate.

    2. Permeate flows for single element may vary ± 15%.


    Operation Notes

    1. Please ensure chemicals and lubricants don't affect membrane elements adversely in use.

    2. If system shutdown for a long time, please soak membrane elements in the preservative solution to prevent bacterial growth.


    Other Business

    MBBR thermopnore bio-membrane reactor technology

    1. New sewage treatment plant;

    2. Upgrading of old sewage treatment plant;

    3. Small integrated sewage treatment plant.


    Advantage

    1. Upgrading from activated sludge process to MBBR biology thermopnore takes only 4-30 days.

    2. The volume loading of MBBR tank is 1.7-5 times that of activated sludge process.

    3. It has an absolute cost advantage for water quality of low pollution concentration and high flow.

    4. Sludge reduction can be realized under low load operation without sludge bulking.

    5. Strong toleration for change of water environment, stable leachate.

    6. Aerobic autotrophic nitrobacterium can grow sustainably on the filler of aerobic tank, and their activity will not change due to change of aerobic and anaerobic environment.


    Using our 1.5mm Dust Stopped Fence Wind Air Screen Perforated Metal, our customers can improve productivity, extend the service life of equipment, reduce maintenance, and gain profit growth. We will integrate resources, create a perfect integration of corporate and social resources, take up greater responsibility for our customers, employees, shareholders and society, and create more value. We are implementing three strategic initiatives of scale, platform and specialization, and aiming at four strategic goals of finance, market, management and society.

    Hot Tags: 4040 extra rejection ro membrane elements, China, suppliers, manufacturers, custom, price, quotation, FRP Spinning Industry Tank, FRP Desulfurization Tower, RO membrane for desalination water, RO membrane elelments for sewage treatment, FRP Pesticide Industry Tank, Fixed length FRP Sewage Pipe